Hydrographic surveying&
dredging project:

 

Near shore dredging operation supervisor and head of the hydrographic survey team | Oceana Advanced Industries Ltd. | in Dar Es Salaam port, Tanzania. The Project included seabed mapping and dredging of 2 km x 50 m berth. 

My Responsibilities:  

  1. Managing 18 ship crew members (6 days per week, 12-16h). 
     
  2. Real-time operation fault detection, decision making & problem solving. 
     
  3. Ship Steering/Maneuvering within the port for docking and dredging operation.  
     
  4. Survey boat complete operation: Data acquisition & preliminary results analysis.
  • The Dredging Vessel Specifications: M/V "TANYA", Length; 60.6m, 2216 KW engine. 
     
  •  Survey Boat Instruments: Single-Beam Sonar System (Reson), AgGPS (Trimble).